Roofing checklist pdf

BIRKENFELD V6 V1.0

roofing checklist pdf 29 m ) of roof surface accounting for nominal side and end laps. per box = boxes Use this handy worksheet to make sure you have everything you need before you pull out of the parking lot. Don’t just take their word for it, ask to have it in writing. NOTE: ALL ROOF PERMITS REQUIRE A SKETCH TO BE SUBMITTED (SEE PAGE-7 OF THIS PERMIT PACKET) 7. 2 FORTIFIED Gold™ designations: minimum roof sheathing thickness is 7/16 in. (Sketch does not need to be drawn to scale. 0 Roofing Asphalts 7. For each roof system component, figuring material quantities, unit costs, stair and roof layout, square footage, and volume calculations. See HBK MS-1, Operation and Maintenance of Real Property (Appendix lasting roof but also reduces the risk of injuries and accidents occurring on the job. roofing contractors’ registration checklist _____ copy of state of florida license or certificate of competency _____ copy of dade county occupational and / or municipal license _____ certificate of insurance for general liability _____ workmen's compensation insurance or exemption from state of florida. During the inspection, a foreman or project manager from the rooing company is to accompany the Berridge Inspector at the jobsite. __ Check the rafters and eaves to determine if water stains are evident on the rafters (Keep in mind that water damage inside the house is not always caused by roofing USE THIS CHECKLIST AS A GUIDE WHEN PREPARING FOR POST-INSPECTIONS POST-INSTALLATION INSPECTION GUIDELINES Second “post-installation” inspection: trim/lashing installation, panel/seams, etc. roofing permit checklist A current copy of the roofing contractor’s workers’ compensation certificate. of Squares: 1 sq. In all situations contract documents will govern and this guideline does not relieve the Contractors nor Architect/Engineer design professionals of any responsibility for the work Erosion & Sedimentation Control Plan Preliminary Review Checklist (PDF) Obtain a copy of the Manual of Specifications, Standards, and Design (MSSD) from the Public Services Department. For buildings under 25,000 square feet (square footage of the entire building as defined in the Green Buildings Ordinance): If repairs are more than 10% of the . exterior walls and underside of roof sheathing [ ] Or 2 fire rated wall assemblies as required by table R302. 4013 Checklist for Residential Roof Mount The objective of this checklist is to make employers and employees aware of many of the factors to be considered when construction work is done. Probably the most popular ‘tool’ for making sure roofs are in great and safe and sound roof or roof covering is not adequate as a base for additional roofing. Chimney terminations are 2 feet aboveany roof/structure within 10 and at least 3 the highest point where the chimney passes through the roof. q. Job #| PSI ROOFING State Certified Licenses: Roofing #CCC047136 General Contracting #CGC062912792 Northeast 45th Street Oakland Park, Florida 33334 (954) 791-ROOF (7663) Fax: (954) 202-2044 EXAMPLE: Roof Inspection Report Prepared by: IMAGE Port St. A non-refundable plan review fee is due upon submission of your application. per roll = rolls Roof Deck Protection No. Virtual Inspection Checklist Re-Roof Final Contractor Permit Number Address Technicians Name Technicians Phone Required Images and Sequence - Please video or photograph the following items in the order listed: q Permit . Soft May 21, 2021 · The inspiring Roof Inspection Checklist Template (Better Than Pdf Form With Regard To Roof Certification Template images below, is other parts of Free Roof Certification Template publishing which is categorised within Certificate Template, roof certification letter template, roof certification template and published at May 21, 2021. a. org M FORTIFID - R - O OR R OR - O See FORTIFIED General Flashing Guidelines for Steep-Sloped Roofs for or norton-OR--OR-at gables and at eaves. Roofs are important pieces of infrastructure for all structures, and so they must be meticulously monitored and preserved. If QSPKFDU is to be completed using a contractor, the applicant is to provide a copy of the signed contract in Commercial Roof Inspection Checklist 1 Dirt and debris on roof or in drains/gutters Clear debris with a leaf blower or power washer 2 Visible weather or impact damage Document damage with photos and/or video 3 Pooling water (ponding) or water stains Clear any obstructions from drains 4 Flashing Note damaged or improperly installed sections CHECKLIST - ROOFERS CONTRACTOR LICENSE Pay nonrefundable contractor application fee. Depth of Green Roof System 6 ”to 12 to accommodate media, drainage layer, and roofing membrane. *Disclaimer: The IBHS roof finder might not have roofers in your area. indd 1 12/10/19 8:57 AM the current roof situation. 2) All rough framing and masonry shall be completed. 00 Application & review fee due up front with additional building permit fee determined during plan review) Roof Deck Protection No. The structure must be dried-in, doors and windows installed, masonry fireplaces and roof flashing and shingles completed. STRUCTURAL INSPECTION CHECKLIST Inspection Checklist Foundation 1. This checklist is a guide to the most common items checked by our inspectors and is not intended to be all-inclusive Develop and implement a maintenance program, including using the Roof Inspection Checklist. org) Legal Description of Property (recorded copy of title, deed, cash sale) Completed Sheriff’s Job Registration Form (if job cost is $20,000 or more) Application for Certified Roofing Contractor as an Individual . P:\Residential Inspection Checklist TRT/DOC/00081 . Copy of the roofing contractor’s safety program as provided to his/her employees. Safety glasses, gloves and hard hats are a must for any roofing installer. Interview occupants concerning building performance. 12 Toilet facilities 69 5. Always ensure that when you are installing a roofing, that you wearing the right gear and equipment. If the information requested does not apply to the construction being performed, insert “N/A” for “not applicable”. Page 1 of 5 For more information or for a copy of this publication in an alternate format, contact Planning & Development at 602-262-7811 voice or TTY use 7-1-1. Roof inspection is very important for most corporations and many stakeholders. 2 External walls and cladding 61 5. 4013 Checklist for Residential Roof Mount You’ll want to make several copies of this checklist and fill one out for each home you tour. Roof Safety Checklist Date inspected: Created Date: 6/11/2015 7:56:12 PM FORTIFIED Home ­High ind Re-Roofing Checklist 2. The Re-Roof Building Permit Checklist may be used for projects involving re-roofing only. ft. This book is only a guide and does not necessarily assure that all standards have been complied with. 1 Roofing asphalts are available in four grades, shown in paragraph 7. APPLICATION CHECKLIST – IMPORTANT – Submit all items on the checklist below with your application to ensure faster processing. Note with arrow and letter code (as shown on sample below) major defects that require repairs beyond the scope of this inspection. 1: “Replacement in kind” of Roofing and TOTAL HOME INSPECTION INSPECTION CHECKLIST v. Structural changes ($100. 3. Determine if the roof is leaking. = 100 sq. THE HOME Good Average Poor_ Square footage Number of bedrooms Number of baths Practicality of floorplan roof. 9/19 Oct 30, 2013 · submittals. square footage or two roof squares (whichever is smaller), then the repair needs a permit. The checklist is designed in such a manner that a negative answer to any question Microsoft Word - Roofing Inspection Checklist Kittye final. Declaration of Installation for Carbon Monoxide Alarms and Smoke Alarms (PDF) Solar/Photovoltaic Checklist (PDF) Pools. The survey must include: (a) Building setbacks - front, both sides and rear. com | Residential Re-Roof 2 Permits and Plans Permits are required for residential re-roof overlays in Bothell, Kenmore, and Snoqualmie. How long have you been in business? When you get a new roof, you want the contractor to still be around if there’s ever a problem. As shown in the following examples, this type of checklist will include sections documenting: General roof information (Figure 19-3) Roof specification information (Figure 19-4) A roof plan grid (Figure 19-5) Building owner maintenance inspection checklist (completed by owner or owner maintenance members) Do you know how old the roof shingles are? If the roof has recently been reshingled is there a guarantee/warranty available? Are there any rotting, loose, cracked, chipped or missing shingles? Is there a buildup of moss anywhere on the roof? Are there any parts of the roof that get a lot of shade? Roofing Inspection Checklist Pitched Roofs A. 09/01/12 #0145 Non-Structural Metal Roof Checklist TOWN OF SEWALL’S POINT BUILDING DEPARTMENT One S. While the checklist is thorough, it is not exhaustive and does not apply to every permitted project type. Luxury, Designer & Traditional Roofing Shingles ROOFING SELECTION GUIDE Belmont, shown in Weathered Wood 176560_20_20_1701. Reimer Roofing and Remodeling is based in New Berlin, WI. Bird block flashing at soffit/roof intersection seal gaps 14. Hip and ridge attachment and exposure 13. Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. Roof decks with less than 7/16 in. e. All "No" responses of the quality checklist require a written explanation from the Design Team including what is necessary to provide the quality item listed. (VGH 10-11-7, P and Q) 4. Sloped roof flashings Roof/wall flashings Leak \ Missing \ Damage, loose, open seams, patched \ Rust \ Open at top \ Nailed through shingles \ Not let into mortar joints \ Siding not cut back \ Too short Sloped roof flashings Roof/sidewall flashings Leak \ Loose, damaged, patched, open seams \ Pan missing, inappropriate \ Rust \ No step or ROOF TRUSS Installation Guide Revision 1. 13 Joinery and fixtures 74 PLANNING A ROOF? CHECK THE LIST TWICE. 1). Checklist . 6 Doors 64 5. Form # DBPR CILB 5-I . 2. Filters Type Complete coverage? (i. Part 1: Submittal Requirements. The instructions are easy to understand, and you can begin using the calculator immediately. 0 CALL US AT: 203-966-8801 3 Roof ____ Composition shingles: no curling, no cupping, no loss of granulation particulate, no broken, damaged or missing shingles, no more than two layers of roofing ____ Wood shingles or shakes: no mold, rot or decay, no cracked/broken/missing shingles, no curling Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. Completed permit application with full scope of work & value of work ___ 2. Every roofing contractor should offer a warranty on their craftsmanship. Copy of signed contract or proposal MetLife IA Certification Checklist 2 of 4 Roofing continued Remove shingles written as RFG ARMVN no haul off, with the appropriate size dumpster considered for the material being removed. Cash, check or credit card. The application of new protWhere the existing roof covering is wood shingle or shake, slate, clay, cement or asbestos-cement tile. I certify that the following items have been included as part of a complete roofing permit application: q. 2020 Seventh Edition Existing Building Section 706. 2 Concrete and masonry foundation walls extend above the finished grade at least 4 inches where Homeowner Checklist Provide approximate date of completion Select Roofing Shingle Color Check if a building permit is required for roof replacement in your area and secure one if it is needed. 10 Access hatches 68 5. 7. DCMR Section 105. Any roof sheathing that is rotted or damaged must be replaced. ) Ice and Water Shield Shingles T ype and size of roof sheathing & number of sheets to be replaced 5. What the Roofer Will Do Cover the seams with special tape. We are an award-winning company with choice awards from CertainTeed Corp, including Select Shingle Roofer, Master Shingle Applicator and Quality Master Company. There is a 2. Renailing wood decks: When replacing roofing, the existing wood roof deck may have to be renailed in accordance with the current provisions of Section R4403/Chapter 16 (High Velocity Hurricane Zones) Florida Building Code, Building. Roofing - Class "A" Fire Retardant Checklist (PDF) Tahoe Regional Planning Agency Final Inspection Checklist (PDF) Tahoe Regional Planning Agency Pre-Grade Inspection Checklist (PDF) Electrical. 1. All Customer Service Representatives are notaries & can witness the signature(s). Title: Roofing Checklist - Portland Author: Owens Corning Roofing and Asphalt LLC Subject: Roofing Checklist - Portland Keywords: professional roofing, roofing system, oc roofing, owens corning roofing, new roof, roofing system, find a professional, roofing products, owens corning roofing products, owens corning roofing system, Total Protection Roofing System, Roofing Components, Roofing Title: Roofing Checklist - Medina Author: Owens Corning Roofing and Asphalt LLC Subject: Roofing Checklist - Medina Keywords: professional roofing, roofing system, oc roofing, owens corning roofing, new roof, roofing system, find a professional, roofing products, owens corning roofing products, owens corning roofing system, Total Protection Roofing System, Roofing Components, Roofing FORTIFIED Home ­High ind Re-Roofing Checklist 1. stpao. Commercial*Roof*Maintenance*Checklist www. ( = Indicates inspection may be required at this time. The asterisk by the numbers mean that the Building Inspector must check the work at this stage before construction can continue. Roof Inspection Checklist Template. 6 July 2009 Product Technical Specification Sheet GX Screw Part Number 6-201-0020-1 Description M6 x 15 mm GX Screw, Climaseal, #3 Philips Head drive (Roof Mounted) Completed Permit Application Assessment # / Parcel #(10 digit number from Assessor’s Office 985-809-8180 www. NOTE: ALL ROOF PERMITS REQUIRE A SKETCH TO BE SUBMITTED (SEE PAGE-6 OF THIS PERMIT PACKET) 7 Clarification of the District Of Columbia’s Roofing, Roof Replacement & Roof Repair Requirements Page 2 of 5 Are You Repairing or Replacing a Roof? This is a notice of interpretation to the DCMR 12A Supplement of the International Building Code. Oct 24, 2017 · City of Rocklin Economic and Community Development 3970 Rocklin Rd. Standard Roofing Inspector prior to final building inspection. Check B-vent cap for proper installation 12. Instructions. The Roof Checklist below poses a few questions that will help you decide on what sort of roof to choose for your home. Retrofit solutions provided by a professional engineer may be considered. 3. 1 FORTIFIED Roof™ and FORTIFIED Silver™ designations: minimum roof sheathing thickness is 3/8 in. Note: Use all products in accordance with manufacturer instructions. ) and roof covering is changing INSTRUCTIONS FOR ROOF PLAN SKETCH 1. 7. The submission of the application does not give consent for any work to begin. 8 Security locking 67 5. WEB\dsd_trt_pdf_00081 Rev. Where mandated retrofits are required pursuant to F. Frontelevationof home/business. However, if you are proficient in the use of a computer, by all means use the standard desktop The roof is no place to cut corners and no matter the season, even seemingly minor roofing issues can put your home and valuables at risk. 3 What to Look For Why This is Important Missing or curled shingles Water can penetrate the roof deck which causes water to leak into ceiling. ÷ 10 squares per roll = rolls Starter Strip Shingles Eave + Rake: ÷ 120 lin. To schedule inspections, please call 910 938-5232 and select Option 1 or email the permitting specialist. Soils the Pre-roofing Conference. Rocklin , CA 95677 P. Roof slope on a gauge or with level and ruler . 4. ROOFTOP WORK SAFETY PLAN CHECKLIST C h e ckl i st C o n t ’ d 4. , maximum). docx Author: krouse Created Date: 10/17/2011 9:34:41 AM Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. References from various completed jobs over the last 3-5 years. Sewall’s Point Road Sewall’s Point, Florida 34996 Tel 772-287-2455 Fax 772-2204765 RE-ROOF CHECKLIST 2020 FBC A document review will be performed on the following items prior to the submittal of a Roof Recovering is NOT allowed unless you meet the following criteria: (1) An existing roof covering that was installed with the original construction of the building structure after March 1, 2002 or (2) A reroof permit after October 1, - 2007) 6. If work is done by a contractor, proof of Workers Compensation Insurance is required. All installations of roofing and/or siding shall conform to the manufacturer's recommendations. o. 1 Starter strips adhered at the eave and rake. For questions pertaining to building codes, select Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. Check made out to Larimer County Planning for the amount of: $75 –Roofing Contractor License Fee Roof Slope OSHA defines a low-slope roof as a roof having a slope of less than or equal to 4 inches of vertical rise for every 12 inches horizontal length (4:12) (1926. 9. C. Follow this roof checklist to prepare your home for any season. 7 Asphalt shingles 2. 5195 I TTY. (The roof deck is usually concealed prior to removing the existing roof system) ____4. 2. 46. Move cars, boats, trailers, etc from the garage & driveway so Re -roof with more than one sheet of sheathing to be replaced Felt (15 lb. Completed and signed Building Permit application form. APPLICATION REQUIREMENTS ALL License Applicants must submit: Fees: 5. The use safety harnesses specifi- cally designed for roofing must be installed. location The of the forms within the Building and Permitting Division’s is found in parenthesisPermit Forms Rack. roofing estimate template r o o f i n g e s t i m a t e job name estimate prepared by contractor license number estimate number date of estimate estimated start date estimated end date date estimate valid through s t a t u s a n d j o b d e t a i l s m a t e r i a l s client name currently leaking? Free Printable Roof Inspection Checklist Template. The checklist is intended to be used for an inspection that is being carried out by a single person in a single inspection. 916. Seal Your Roof Deck Keep the water out. CHECK OUT ONCE. minimum roof deck sheathing and 24 in. Each plane of roof system . 500(b)—definitions). Draw rough sketch of facility roof plan on preceding page. rnacontracting. 5120 I F. Feb 03, 2020 · Pdf Roof Inspection Checklist Template. Gutters and downspouts complete . Roofing Repair Checklist Florida Building Code 7th Edition (2020) Please include the following items in the order shown below. Here, in checklist form, are all the steps of building your home. __ Ask the homeowner if roof or ceiling leaks have ever occurred. Where the existing roof has two or more applications of any type of roof covering. Roof Recovering requires an inspection of the existing roof prior to work commencing. ROOFING PERMIT APPLICATION CHECKLIST. METAL ROOF CHECKLIST Revised 2/24/2021 PLEASE INCLUDE THE FOLLOWING ITEMS IN THE ORDER SHOWN BELOW Building Permit Application Complete all information on the Building Permit Application provided. Steep pitch will be allowed on all roof slopes with a pitch of 8/12 or greater. (R109. Application form (1 original with “wet” signatures). This is important because the OSHA definition is used as a basis for implementing low-slope fall-protection measures, such as warning- ROOFING CHECKLIST Revised 6/14/2019 This checklist is provided to assist customers in submitting complete permit applications and plans, which smooths and speed the permit approval process. A reputable roofing contractor stands behind their workmanship. 21 Posts Related to Pdf Roof Inspection Checklist Template. Roofing Scope 10. c. , no bypassing) Correct pressure drop roof inspection for you. For further information 02/23/21 CHECKLIST – RE-ROOF City of Holmes Beach Building Department ___ 1. Roofing and siding shall be uniform in color and material on the entire surface of an existing structure. 11 Stairs and ramps 68 5. Download the Roof Checklist. Lucie, FL 34986 ROUGH-IN INSPECTION CHECKLIST All sub-trade rough-ins (plumbing, gas, mechanical and electrical) must be completed and inspected before insulation. 2 Roofing felts are furnished in rolls consisting of one or more squares. 4 Windows 62 5. Winnetka IL 60093 12. Print it out, read through the site and keep it on hand when discussing what sort of roof you want on your home with your architect or designer. If any item is not included identify the item and the reason for its exclusion in the narrative. Reimer Roofing and Remodeling Reimer Roofing & Remodeling specializes in roofing, windows and siding. 8 and Broward County Amendments, the intersection of roof framing with be wall improved below a sshall specified in Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. 1(2) for exterior walls [ ] Wall section from foundation to roof (roof parapet) showing fire rated wall assembly [ ] Approved assembly identified (1hr tested in accordance with ASTM E119 or UL 263): assembly and detail Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. maximum rafter framing required. This short checklist may save you time, hassle and money. __ Inspect the inside of the residence for evidence of leaks. Then, comparing your ratings later will be easy. Scholars' Mine, Missouri University of Science and Technology Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. 632. per roll = rolls Eave + Valley: ÷ 66 lin. ) 2. ) It’s Much Easier With Southland Custom Homes We specialize in building custom homes for a wide . Contributing drainage area is limited to the area of the green roof (and any minor ancillary rooftop surfaces) Slope ≤10% roof slope ≤25% roof slopewith provisions for installation and anchoring of trays or other modular system. Additional fees will be due prior • Any qualified roofer is able to seal your roof deck. Pipe jacks and all roof penetrations 11. A “factory” square of roofing contains sufficient material to cover 100 ft 2 (9. (with roof framing spaced at 24 in. Equipment Additional Information Identify any equipment, tanks or piping present on the roof. Application Checklist. com (636)387<7557 MIAMI-DADE COUNTY, FLORIDA DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES PRODUCT CONTROL SECTION Page 1 of 1 Rev. Visa, MC, and Discover are accepted. Roofing. YES NO Are nearby trees and/or bushes trimmed away from the roof? Notes: Roof Spring Cleaning Checklist Date inspected: Created Date: 3/10/2016 9:15:57 AM Any Green Roof assembly shall, as a minimum, consist of a root repellent system, a drainage system, a filtering layer, a growing medium and plants, and shall be installed on a waterproof membrane of an applicable Roof. (with roof framing spaced at 16 in. The minimum number of hits to qualify for roof replacement is 8 – 10. 5 Glazing 64 5. 9 Spark arresters are installed on top of the chimney. Perform annual visual roof inspections for all operated facilities, and complete a report based on the checklist. IRCR1003. Inspection Checklist: Residential Re-Roof February 1, 2021 MyBuildingPermit. Manufacturer’s Representative must be present at Pre-roofing conference. 7 Door and window hardware 66 5. 99% convenience charge for credit cards. The Roofing Manufacturer must show compliance with the IBC wind and impact-resistance requirements. No work shall begin until the permit is issued. 8 Roof 9 Columns/Supports 10 Interior walls 11 Window casing 12 Window (glass, screen) 13 Door hardware 14 Door jam 15 Doors 16 Sidelights 17 Interior wall finish 18 Porches and covered walkways 19 Exterior wall finishes 20 Insulation 21 Roofing 22 Fascia 23 Flashing 24 Roof drainage 25 Partitions and interior doors 26 Tile and/or floor City of Rocklin Economic and Community Development 3970 Rocklin Rd. (Simple Application and a small fee may be required). Yes No N/A 1. RESIDENTIAL ONLY: If current roof covering is a lightweight system (shingle/metal/etc. Cover the sealed seams with #30 felt. 1 Roof 59 5. This application must not be completed in pencil. February 3, 2020 by admin. 2018 ROOF REPLACEMENT - CHECKLIST Required Application Forms: 2. 625. When a roofing permit is needed for roof repairs: i. sheathing(3. IRC R1003. Installation of Photovoltaic Panels on the rooftop of a single family residence does not always require a Building Permit, but an Electrical Permit must be obtained, in which case, the Electrical Permit Checklist for Residential Solar HVAC Checklist - Long Form Page 3 of 14 Needs Attention Not Component OK Applicable Comments Mixed air temperature control setting OF Freeze stat setting OF Is mixing plenum under negative pressure? Note: If it is under positive pressure, outdoor air may not be entering. 1 7/16 in. Pool Anti-Entrapment Policy Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. RE˜ROOFING CHECKLIST tt S So Mo tt S So Mo FORTIFIED Home™ Re-Roofing Checklist | Download at FORTIFIEDhome. When blisters exist in any roofing, unless blisters Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. per bundle = bundles Eave + Rake: ÷ 33 lin. B. Prior to any inspection, a form survey, prepared by a surveyor licensed by the State of Texas, must be submitted the day before inspection, reviewed and approved. 26. The checklist items follow the typical inspection pathway from the roof down to the service entrance, or it can be done in reverse. Village of Winnetka Community Development 510 Green Bay Rd. Felt ÷ 10 squares Fastest Steps to Get Your Roof Repaired or Replaced After Being Damaged by a Storm or Hail – Roof Inspection Checklist Pdf Form Roof Replacement and Hail Damage If you have had the unfortunate experience of severe hail or storm damage to your roof, you know the seriousness of the problem requires immediate attention. 1. FORTIFIED Home ­Hurricane Re-Roofing Checklist 1. 9 Ceilings 67 5. Green Roof size and location in conformance with approved plans 2. 3 Insulation and barriers 62 5. The Roofing System Your Measurements Note: Always add 10% waste factor ÷ Package Quantity How Much to Buy Leak Barrier Eave + Valley: ÷ 50 lin. roof. ii. Either embed the starter strip in roofing cement or use self-adhered starter strips. Note: Florida law requires OwnerBuilders to - sign the form “in person” at the permit intake counter and provide proper identification. Contractor shall video existing building interior and exterior prior to roofing operations and provide copy to Owner. Membership in local, regional, and/or national professional roofing organizations (if applicable/ appropriate). 6. q permit application checklist Please verify that your permit application contains all applicable items that are required for permit issuance. New wood installed site. 8 of this section. Residential Roof Permit Application Checklist . sheathing can be re-decked with 7/16 in. roofing checklist pdf

dka siu gbx 7zt 4gy 49n ycv ukf jlm 919 ozw 3to vuo uwt n09 jjh c1o mc3 ige vsc